Jakarta Intra Urban Tollway Part V

Jakarta Intra Urban Tollway Part V, Central North South Link Cawang Interchange, OECF Loan IP-286

A coordinated plan of the North South Link Development, with DKI Jakarta Road network and Jakarta ‑ West Java Tollway System.
A detailed execution plan was prepared of engineering designs such as geometric pavement, structure, drainage facilities, and landscape designs.

A multi‑disciplinary team approach to prepare the definite plant and right of way plan with proposed utility adjustment/diversion, traffic diversion/control during construction period. A computer system was also used to complete all the works within the minimum time budget.